TM 9-2320-260-10(16) From outside van, push upwardand inward to fully close hinged floor (11)and roof panels (8). Turn lock handle (17)clockwise to lock floor and roof panels inclosed position.(17) Remove holding rods (10) fromend panels (9) and insert each rod intoretaining clips on beam.(18) Close end panels (9) at all corners.(19) Turn left ratchet (2) clockwise withratchet wrench (6) to retract right side panel(16). Crank both sides until fully retracted.Push locking plunger (1) upward to lockratchet (2).(21) Insert end of lock handle assembly(22) into lockrod brace (20). Close lockhandle assembly (22) and secure in placewith chained pin (21).(20) Turn four side locks (18) clockwisewith side panel lock wrench (19).(22) Remove two jack spikes (26) fromfootpad (27) and install jack handle (24) inleveling jack (25). Rotate jack handle (24)clockwise until footpad (27) clears ground.(23) Remove leveling jack (25) fromvan body bracket (23) and detach footpad(27) from jack.(24) Remove leveling jack chained pin(28) and slide telescoping jack tube intomain jack tube. Reinsert chained pin.(25) Repeat steps 22 through 24 withremaining van body leveling jacks.(26) Stow leveling jacks (25), footpads(27), and jack spikes (26) in compartment atrear of van body.TA 0944012-187
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business