TM 9-2320-260-10
(1) For class 60 bridge sections: a crane (6) must be used to load the truck (refer to
the applicable crane technical manual for crane operating procedures).
(2) For M4T6 float bridge: use a crane (6) to load the truck if available (refer to the
applicable crane technical manual for crane operating procedures).
d. Loading the Truck Manually.
NOTE
Recommended number of personnel for this task is twelve.
A second truck with winch is required.
(1)
body.
(2)
(3)
Remove six capscrews (7) from grill (8) and remove grill (8) from truck cargo
Stow capscrews (7) in cargo body holes (9).
Loosen and remove turnbuckle (11) from snatch block (10).
NOTE
When a second truck with a winch is used to assist in loading of
the bridge transporting truck, it should be parked so as not to
interfere with loading. The winch should be in line with the snatch
block (10) and winch cable should be clear.
TA 094405
2-191