TM 9-2320-272-10
3-11.
WHEELS AND TIRES (Contd)
(c)
Prepare wrecker for boom (1) operation (para. 2-24).
(d)
Position boom (1) with boom hook (2) centered over spare tire (5). Attach boom hook (2) to chain ring
(3).
(e)
Raise spare tire (5) from spare tire support (6).
WARNING
Keep spare tire from swinging. Injury may occur if personnel are struck by swinging spare tire.
(f)
Position boom (1) to right side of vehicle until sufficient clearance is obtained to lower spare tire (5) to
ground, and lower spare tire (5).
(g)
Remove chain (4) from spare tire (5) and boom hook (2).
(h)
Secure wrecker from boom (1) operation (para. 2-24).
(7)
Installation (M936/A1/A2).
(a)
Install utility chain (4) around spare tire (5) with utility chain hook (7) centered on top of spare tire (5),
and take up slack.
(b)
Prepare wrecker for boom (1) operation (para. 2-24).
WARNING
Keep spare tire from swinging. Injury may occur if personnel are struck by swinging spare tire.
NOTE
Assistant will guide spare tire to tire support.
(c)
Position boom (1) with boom hook (2) centered over spare tire (5). Attach boom hook (2) to chain ring
(3).
(d)
Raise spare tire (5) and place in spare tire support (6).
(e)
Remove chain (4) from spare tire (5) and boom hook (2).
(f)
Install brace (9) and wingnut (8) on spare tire (5) and support (6).
(g)
Return utility chain (4) to tool compartment.
(h)
Secure wrecker from boom (1) operation (para. 2-24).
3-38
