TM 9-2320-366-10-1
Table 2-3. Preventive Maintenance Checks and Services (M1084 and M1086) (Cont)
Location
Item
No.
Interval
Item to
Check/
Service
Crewmember
Procedure
Not Fully
Mission Capable
If:
3
During
MHC
Remote
Controls
(Cont)
k. Place BOOM lever in
UP position to decrease
boom angle.
l.
Place HOIST lever in
DOWN position to pay
out cable.
m. Place HOIST lever in
UP position to reel in
cable.
k. Boom angle
does not
increase.
l.
Hoist does not
pay out cable.
m. Hoist does not
reel in cable.
n. Operate SWING lever
to align holes in
turntable bearing and
install turntable bearing
retaining pin.
2-142