TM 9-2320-366-10-1
2-29. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION
(CONT)
NOTE
Perform steps (6) through (9) if boom was extended.
(6) Remove quick release pin (4) from boom (1).
(7) Push in end of boom extension (5) so that boom (1) is fully retracted.
(8) Align holes (5) in boom (1).
(9) Install quick release pin (4) in boom (1).
(10) Support end of boom (1).
(11) Remove quick release pin (6).
(12) Lower boom (1) to stowed position.
(13) Install quick release pin (6) in one of unused holes.
2-270