TM 9-2320-366-10-1
2-37. M1084/M1086 MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
(11) Position HOIST lever (1) to UP to remove all slack from cable (2).
i. Disconnect REMOTE CONTROL UNIT.
(1) Position toggle switch (1) to OFF.
(2) Position MAIN POWER switch (3) to OFF.
(3) Disconnect cable (4) from REMOTE CONTROL HOOK UP receptacle (5).
(4) Disconnect cable (4) from REMOTE CONTROL UNIT (2).
2-376
Change 1