TM 9-2320-260-10
Table 2-2. Operator/Crew Preventive Maintenance Checks and Services (Contd)
NOTE: These checks are to be made in the order listed, within designated interval.
B-Before operation D-During operation A-After operation W-Weekly M-Monthly
ITEM TO BE INSPECTED
PROCEDURE: Check for and
h. Check PTO, drive shaft, hydraulic pump, and
control valve for damage, leaks, and security of
have repaired, filled, or
adjusted as needed
WARNING
Never perform PMCS checks under
raised dump body unless safety braces
(2) are properly positioned. If dump
body suddenly lowers, serious injury or
death will result.
g. Inspect cylinders (1) for damage, leaks, and
security of mounting to subframe.
mounting.
i. Check roller arm assembly for cracks, breaks,
damage, and security of mountings.
EQUIPMENT IS
NOT READY/
AVAILABLE IF:
Class III leak is evident.
Class III leak is evident.
Any evidence of cracks,
breaks, damage, or
loose mountings.
TA 094275
2-60