TM 9-2320-260-10
(9) Repeat steps 5 and 6 for left side winches
(10) For left side forward winch cable (10): position cable (10) in side rail gutter (12)
and secure hook (13) on end of gutter (12).
(11) For left side rear winch cable (11): position cable (10) inside rail gutter (12) and
secure hook (13) on end of gutter (12).
(12) Continue winding cables (10) and (11) until tight by operating winch ratchet
lever (5).
g. Unloading Truck Using Crane.
NOTE
Do not exceed lifting capacity of crane.
A crane must be used to unload class 60 bridge sections, If
available, a crane should be used to unload the M4T6 float
bridge.
Four personnel required for this task.
(1) Use crane to unload heavy parts (refer to applicable TM for crane operating
procedures).
TA 094412
2-197