TM 9-2320-260-10
(2) Move spring-loaded pawl (1)
forward and pull out 3 or 4 feet (0.915
or 1.220 meters) of slack on cable (2).
NOTE
Release pawl (1) by pushing
down and forward on ratchet
lever (5).
(3) Repeat steps 1 and 2 for remaining
three winches.
(4) Loosen and remove cables (2) from lashing hooks (10), lashing rings (3), and
lashing rings (4).
(5) Prepare to wind cable (2) on winch (6).
NOTE
Retain tension on cable to prevent from becoming crossed on
winch during winding.
(6) Continue winding until cable hook (13) is about 12 feet (3.660 meters) from
winch (6).
(7) Place winch cable (2) around left rear lashing hook (9) and secure hook (8) to
ladder bracket (7). Continue winding cable (2) until tight by operating winch ratchet lever
(5).
(8) Repeat steps 4 through 7 for opposite rear winch.
TA 094411
2-196