TM 9-2320-272-10
2-29.
PREPARATION FOR SHIPMENT (Contd)
e.
Exhaust Pipe Extension Removal and Installation.
Do not touch hot exhaust system components with bare hands. Injury to personnel may
result.
(1)
Removal
(a)
Remove locknut (25) and screw (22) from muffler coupling clamp (21).
(b)
Remove muffler coupling clamp (21), gasket (24), and muffler extension (20) from muffler (23).
(c)
Install screw (22), locknut (25), muffler coupling clamp (21), and gasket (24) on muffler extension
(20).
(2)
Installation
(a)
Remove locknut (25) and screw (22) from muffler coupling clamp (21).
(b)
Remove muffler coupling clamp (21) and gasket (24) from muffler extension (20).
(c)
Install muffler extension (20) and gasket (24) to muffler (23) with screw (22), muffler coupling
clamp (21), and locknut (25).
(d)
Rotate muffler exhaust extension (20) so that top points away from cab (19). Tighten screw (22)
and locknut (25) to seal muffler extension (20) to muffler (23).
(e)
Start engine (para. 2-12) and check for exhaust leaks.
NOTE
Report removal and installation to unit maintenance to replace gasket and locknut.
2-197