TM 9-2320-366-10-1
Table 2-3. Preventive Maintenance Checks and Services (M1084 and M1086) (Cont)
Location
Item
No.
Interval
Item to
Check/
Service
Crewmember
Procedure
Not Fully
Mission Capable
If:
WARNING
Area must be clear of personnel before operating swing or
telescoping boom. Boom must be rotated and telescoped slow
enough so Operator has control of load. If Operator cannot see
load during operation, operate Material Handling Crane (MHC)
with REMOTE CONTROL UNIT. Failure to comply may result in
serious injury or death to personnel.
2
During
MHC
Operation
(Cont)
j.
Place SWING lever in
CW position (para 2-
37f) to move boom to
right.
k. Place SWING lever in
CCW position (para 2-
37f) to move boom to
left.
j.
Boom does
not rotate to
right.
k. Boom does
not rotate to
left.
Change 1
2-135