TM 9-2320-260-10(19) Install intervehicular electrical cable (22) and two air hoses (20) in the frontthree retaining rings (21) on reach (17). Install electrical cable (22) in electrical connector(25) above the bolster truck pintle.NOTEIt may be necessary to raise lunette (18) manually or with bolstertrailer landing leg (16) to aline lunette (18) with pintle.(20) Install bolster trailer lunette (18)on bolster truck pintle. Close pintle andinstall cotter pin to secure pintle in lockedposition. Install safety chain (19) attached toreach (17) near lunette (18) to towingshackles (26) of bolster truck.(21) Place chain binders (28) andtiedown chains (27) in stowage compartment(23) of bolster trailer.(22) Check operation of bolster failsafebrakes and lighting system before loadingbolster truck and trailer with utility poles.logs, or bridge equipment.2-109
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business