TM 9-2320-260-10WARNINGDuring crane operation, tell all personnel to stand clear of craneand load. A snapped cable, shifting or swinging load can be verydangerous.CAUTION• Do not pay out cable after thehook has reached the load.Cable on drum will loosen andmay kink.• When boom is extended,move hoist and crowd controllevers together to preventcrane block from beingjammed in boom.NOTEConsult crane capacity data platefor load limits before raising orlowering load.(k) Place lifting device (7) around load (8).(l) Move hoist lever (10) to DOWN position to lower hook (9) to load (8).(m) Secure hook (9) to lifting device (7).2-164 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business