TM 9-2320-260-10
(4) Preparation for Travel Without Semitrailer.
(a) Lower and secure shipper braces (11).
(b) Secure lifting slings (13) to hook (10) and outrigger frame tube (12).
(c) Move transfer power takeoff lever (18) to engaged position.
(d) Move hoist lever (14) to UP
position to remove slack in slings (13).
(f) Move power takeoff lever (18)
down to disengage position.
(e) Install pivot post lockpin (17) in
crane pivot post (16).
(g) Move hand throttle (19) to return
engine speed to idle. Shut down engine
(refer to paragraph 2-16).
2-171