TM 9-2320-366-10-1
Table 2-5. Preventive Maintenance Checks and Services (M1089) (Cont)
Location
Item
No.
Interval
Item to
Check/
Service
Crewmember
Procedure
Not Fully
Mission Capable
If:
WARNING
Keep boom clear of all electrical lines and other obstacles while
operating Material Handling Crane (MHC). Failure to comply may
result in serious injury or death to personnel.
Area must be clear of personnel before rotating or telescoping
boom. Boom must be rotated and telescoped slow enough so
Operator has control of load. If Operator cannot see load during
operation, operate Material Handling Crane (MHC) with REMOTE
CONTROL UNIT. Failure to comply may result in serious injury or
death to personnel.
13
During
MHC
Operation
(Cont)
k. Move SWING lever in
CW position (para 2-
50f) to move boom to
the right.
l.
Move SWING lever in
CCW position (para 2-
50f) to move boom to
the left.
k. Boom does
not move to
the right.
l.
Boom does
not move to
the left.
2-171